Installation Preparation

Thank you for choosing Mintech. We’re excited to support your production needs.

1. Machine Space & Unloading Preparation

Please ensure the installation area and unloading plan are ready.
Note: Some components may be secured on top of the machine pallet.

Component Dimensions (L × W × H) Weight
Installation Site Dimensions (L × W × H) Floor Load Capacity

2. Electrical Requirements

All electrical wiring must be completed by a licensed electrician prior to installation.

Item Requirement
, 30A
Power Cable 10AWG, 4-core, Length according to site requirements

3. Compressed Air Supply & Coolant Preparation

A stable and clean air source is necessary for machine performance.

Item Requirement
Compressed Air Supply Pressure ≥ 90psi, Flow ≥ 5 SCFM, Storage tank ≥ 15 gal.
Air supply must be clean, dry, and oil-free (filters/dryers if necessary).
Coolant Requirement 2 gallons Coolant (ethylene glycol antifreeze)
2 gallons distilled water

Remarks:

Air Compressor Example (If you don’t have compressed air available)
Engine Coolant Example

To ensure safe and efficient installation, please confirm the following requirements and submit this form before our technician arrives.


Please complete the following checklist:






We appreciate your preparation efforts!
If you have any questions, please don’t hesitate to contact our technical team prior to installation.

Any delays caused by insufficient preparation may result in extended installation time and additional charges at the customer expense.